12T – Deep Dive: Duties, Survey Control, Curves, Traverses, Drafting & Materials Testing
Source: DA Pam 611-21 ch. 10C (10-12T, Oct 2026 copy); TM 3-34.55 (Construction Surveying, 3 Aug 2012); TM 3-34.51 (Construction Drafting, 15 Jun 2012); TM 3-34.43 (Materials Testing, 3 Apr 2015). Complements mos-12t-technical-engineer; does not repeat those cards or the TM 3-34.55/3-34.43 construction-staking, moisture, and in-place density cards already in the 12N files. Verify current editions.
- 12T deep dive: What duties does DA Pam 611-21 list for a 12T at skill level 2?
- A 12T2O supervises construction surveying, geodetic surveying, computer-aided drafting, testing on construction materials, and quality control inspections, and corrects and validates GPS survey data.
- DA Pam 611-21 (ch. 10C, Oct 2026 copy), 10-12T a(2)
- 12T deep dive: What additional duties does a 12T have at skill level 3?
- A 12T3O directs and inspects construction and geodetic surveying, computer-aided drafting, materials testing, quality-control inspections, and GPS survey data. The 12T also reconnoiters and plans construction surveys to determine special requirements, determines soils-stabilization methods for military construction, designs concrete and asphalt mixtures, prepares project progress reports, and conducts project briefings.
- DA Pam 611-21 (ch. 10C, Oct 2026 copy), 10-12T a(3)
- 12T deep dive: What duties does DA Pam 611-21 list for a 12T at skill level 4?
- A 12T4O manages a Survey and Design Detachment. The 12T analyzes and interprets field and laboratory tests on construction materials, construction and geodetic surveys, and drafting for military construction; plans airfield, signal, and intelligence surveys and quality-control assurance check procedures; and prepares design specifications for construction projects.
- DA Pam 611-21 (ch. 10C, Oct 2026 copy), 10-12T a(4)
- 12T deep dive: What high-school coursework does DA Pam 611-21 require for initial award of 12T?
- The Soldier must have successfully completed (and be able to show proof of credit by official transcript) 1 year of high school algebra or geometry, or the equivalent. This requirement is effective August 2024.
- DA Pam 611-21 (ch. 10C, Oct 2026 copy), 10-12T b(5)
- 12T deep dive: What OPAT scores does DA Pam 611-21 require for 12T?
- A minimum OPAT score of Standing Long Jump 120 cm, seated Power Throw 350 cm, Strength Deadlift 120 pounds, and Interval Aerobic Run 36 shuttles, in Physical Demand Category “Moderate” (Gold).
- DA Pam 611-21 (ch. 10C, Oct 2026 copy), 10-12T b(4)(b)
- 12T deep dive: Besides B9, P6, Q6, and R7, what other ASIs does DA Pam 611-21 list for 12T?
- Y2 (Transition) and 3C (Operational Contract Support), which applies to SSG through SGM.
- DA Pam 611-21 (ch. 10C, Oct 2026 copy), 10-12T c(5)–(6)
- 12T deep dive: What are typical duties of the construction surveyor?
- Determining distances, areas, and angles; establishing reference points for horizontal and vertical control; setting stakes or otherwise marking lines, grades, and principal points; determining ground profiles along given lines to provide data for cuts, fills, and earthwork volumes; preparing large-scale topographic maps using plane-table or transit-stadia data; laying out structures, culverts, and bridge lines; and determining the vertical and horizontal placement of utilities.
- TM 3-34.55 (3 Aug 2012), para 1-1
- 12T deep dive: How does the required precision of a construction survey vary?
- The precision of measurements varies with the type of work and the purpose of the survey. Location surveys require more accuracy than reconnaissance surveys, and the erection of structural steel requires greater precision than the initial grading of a roadbed.
- TM 3-34.55 (3 Aug 2012), para 1-2
- 12T deep dive: Who decides the degree of accuracy, and what makes a good construction surveyor?
- The officer or NCO in charge of a project usually determines the degree of accuracy. The surveyor chooses methods that fit the allowable time, the tactical situation, the capabilities of construction forces, and current conditions. The best surveyor is the one who runs a survey to the order of precision the job requires with a minimum of time, not the one who insists on extreme precision at all times.
- TM 3-34.55 (3 Aug 2012), para 1-3
- 12T deep dive: What kinds of errors must a construction surveyor watch for?
- Surveyors must always be alert for probable cumulative or systematic errors, which could result from maladjustment or calibration of equipment or from error-producing practices. Laying out foundations for certain machinery and establishing angular limits for fire on training ranges are examples of work that may demand a high degree of precision.
- TM 3-34.55 (3 Aug 2012), para 1-4
- 12T deep dive: How accurate can the results of a survey be compared with the measurements used?
- The surveyor cannot expect resultant data to have a greater degree of accuracy than that of the least precise measurement involved. Both angular and linear measurements that are part of the survey problem must be analyzed in order to maintain comparable precision throughout.
- TM 3-34.55 (3 Aug 2012), para 1-5
- 12T deep dive: What rules apply to a surveyor’s field notes?
- Field notes must be comprehensive, neat, and reliable, and numerical data, sketches, and explanatory notes must be so clear they can be interpreted in only one way—the correct way. Office entries such as computed or corrected values should be clearly distinguishable from original material, often by making them in red ink. Use a sharp, hard pencil (4H preferred); do not crowd the data; keep sketches plain; and record values so they show the precision of the measurement—for example, a rod reading to the nearest 0.01 foot is recorded as 5.30 feet, not 5.3 feet.
- TM 3-34.55 (3 Aug 2012), para 1-6
- 12T deep dive: What is the purpose of a reconnaissance survey for a road or airfield?
- It is an extensive study of an entire area that might be used for a road or airfield. Its purpose is to eliminate routes or sites that are impractical or unfeasible and to identify the more promising ones. Existing maps and aerial photographs may be of great help: contour maps show terrain features and relief, and aerial photographs show up-to-date planimetric details.
- TM 3-34.55 (3 Aug 2012), paras 2-1 and 2-2
- 12T deep dive: What typical data should a reconnaissance survey collect?
- Typical data include sketches and reports of feasible routes; data on clearing and grubbing; the number of stream crossings involving bridge spans exceeding 20 feet or 6 meters; the approximate number of culverts and spans less than 20 feet or 6 meters; descriptions of marsh areas and other natural obstacles; unusual grade and alignment problems; anticipated effects of landslides, melting snow, and rainfall; soil and stream conditions at proposed bridge sites; discrepancies in maps or aerial photographs; and the availability of local materials, equipment, transportation, and labor.
- TM 3-34.55 (3 Aug 2012), para 2-6
- 12T deep dive: What does a preliminary survey do?
- The preliminary survey is a detailed study of a route tentatively selected from reconnaissance information and recommendations. It runs a traverse along a proposed route, establishes levels, records topography, and plots results, and it determines the final location from this plot or preliminary map. The size and scope of the project determine the nature and depth of the preliminary survey for most military construction.
- TM 3-34.55 (3 Aug 2012), para 2-10
- 12T deep dive: What does the traverse party establish on a preliminary survey?
- The traverse party establishes the traverse line along the proposed route by setting and referencing control points, measuring distances, numbering stations, and establishing points of intersection. The party also makes the necessary ties to existing control, if available or required. When no control is available, the party may assign a starting value that can later be tied to a control point established by geodetic surveyors.
- TM 3-34.55 (3 Aug 2012), para 2-12
- 12T deep dive: To what precision does the level party record elevations, and what rule applies if there is no established vertical control?
- The level party takes rod readings and records elevations to the nearest 0.01 foot or 0.001 meter. If no established vertical control point is available, establish an arbitrary elevation that may be tied to a vertical control point later. An assigned value for an arbitrary elevation must be large enough to avoid negative elevations at any point on the project.
- TM 3-34.55 (3 Aug 2012), paras 2-13 and 2-14
- 12T deep dive: When is a transit-stadia party used, and when is a plane-table party used?
- The topographic party may use a transit-stadia party, a plane-table party, or a combination of both. The transit-stadia party is effective in open country where comparatively long, clear sights can be obtained without excessive brush cutting. The plane-table party is used where terrain is irregular; for short route surveys, fieldwork and drawing of the map are carried on simultaneously.
- TM 3-34.55 (3 Aug 2012), paras 2-15 through 2-17
- 12T deep dive: Who may change the paper location during the final location survey?
- The instrument party carefully establishes the final location in the field using the paper location prepared from the preliminary survey. The surveyor should not make any changes without the authority of the officer-in-charge. The centerline may vary from the paper because of objects or conditions not previously considered; the final centerline determines all the construction lines.
- TM 3-34.55 (3 Aug 2012), paras 2-18 and 2-19
- 12T deep dive: What are the four types of horizontal curves?
- A curve may be simple, compound, reverse, or spiral. Compound and reverse curves are treated as a combination of two or more simple curves, whereas the spiral curve is based on a varying radius.
- TM 3-34.55 (3 Aug 2012), para 3-4
- 12T deep dive: What is a simple curve, and how does radius affect it?
- The simple curve is an arc of a circle and is the most commonly used. The radius of the circle determines the “sharpness” or “flatness” of the curve: the larger the radius, the “flatter” the curve.
- TM 3-34.55 (3 Aug 2012), para 3-5
- 12T deep dive: What is a compound curve, and what is a reverse curve?
- A compound curve normally consists of two simple curves curving in the same direction and joined together; surveyors often have to use it because of the terrain. A reverse curve consists of two simple curves joined together but curving in opposite directions. For safety reasons, the surveyor should not use a reverse curve unless absolutely necessary.
- TM 3-34.55 (3 Aug 2012), paras 3-6 and 3-7
- 12T deep dive: What is a spiral curve used for?
- The spiral is a curve with varying radius used on railroads and some modern highways. It provides a transition from the tangent to a simple curve or between simple curves in a compound curve.
- TM 3-34.55 (3 Aug 2012), para 3-8
- 12T deep dive: What are the PI, I angle, and radius of a simple curve?
- The point of intersection (PI) is where the back and forward tangents intersect. The intersecting angle (I) is the deflection angle at the PI; the surveyor either computes it from preliminary traverse station angles or measures it in the field. The radius (R) is the radius of the circle of which the curve is an arc.
- TM 3-34.55 (3 Aug 2012), paras 3-11, 3-12, and 3-13
- 12T deep dive: What are the PC and PT of a simple curve?
- The point of curvature (PC) is the point where the circular curve begins; the back tangent is tangent to the curve at this point. The point of tangency (PT) is the end of the curve; the forward tangent is tangent to the curve at this point.
- TM 3-34.55 (3 Aug 2012), paras 3-14 and 3-15
- 12T deep dive: What are the length of curve and the tangent distance?
- The length of curve (L) is the distance from the PC to the PT measured along the curve. The tangent distance (T) is the distance along the tangents from the PI to the PC or PT; these distances are equal on a simple curve.
- TM 3-34.55 (3 Aug 2012), paras 3-16 and 3-17
- 12T deep dive: What are the central angle, long chord, external distance, and middle ordinate?
- The central angle (Δ) is the angle formed by two radii drawn from the center of the circle to the PC and PT, and it is equal in value to the I angle. The long chord (LC) is the chord from the PC to the PT. The external distance (E) is the distance from the PI to the midpoint of the curve and bisects the interior angle at the PI. The middle ordinate (M) is the distance from the midpoint of the curve to the midpoint of the long chord; its extension bisects the central angle.
- TM 3-34.55 (3 Aug 2012), paras 3-18 through 3-21
- 12T deep dive: What is the degree of curve, and how is it defined by the arc definition?
- The degree of curve (D) defines the “sharpness” or “flatness” of the curve. Under the arc definition, D is the angle formed by two radii drawn from the center of the circle to the ends of an arc 100 feet or 30.48 meters long. As the degree of curve increases, the radius decreases. This definition is primarily used by civilian engineers in highway construction.
- TM 3-34.55 (3 Aug 2012), paras 3-22, 3-23, and 3-24
- 12T deep dive: How does the chord definition of degree of curve differ from the arc definition?
- The chord definition states that the degree of curve is the angle formed by two radii drawn from the center of the circle to the ends of a chord 100 feet or 30.48 meters long, rather than to the ends of an arc of that length.
- TM 3-34.55 (3 Aug 2012), para 3-27
- 12T deep dive: What simple-curve formulas give T, PC, and PT?
- T = R tan(½ I). PC = PI − T. PT = PC + L. (These formulas, except those the TM notes as definition-specific, apply to both the arc and chord definitions.)
- TM 3-34.55 (3 Aug 2012), paras 3-35 and 3-36
- 12T deep dive: What are the PVC, PVT, and PVI on a vertical curve?
- The beginning of the vertical curve is the point of vertical curvature (PVC), and the end is the point of vertical tangency (PVT). The length of the vertical curve (L) is the horizontal distance, in 100-foot stations, from the PVC to the PVT. The curve usually extends ½ L stations on each side of the point of vertical intersection (PVI). Grades G1 and G2 are given as percentages of rise for 100 feet of horizontal distance and are identified as plus or minus depending on whether they are ascending or descending in the direction of the survey.
- TM 3-34.55 (3 Aug 2012), paras 3-138 and 3-139
- 12T deep dive: How are the PVC and PVT stations computed from the PVI?
- Because the PVI is the only fixed station, PVC = PVI − L/2 and PVT = PVI + L/2.
- TM 3-34.55 (3 Aug 2012), para 3-144
- 12T deep dive: Where is the high or low point of a vertical curve, and why does it matter?
- The surveyor uses the high or low point to determine the direction and amount of runoff on summit curves and to locate the low point for drainage. When the tangent grades are equal, the high or low point is at the center of the curve. When both tangent grades are plus, the low point is at the PVC and the high point at the PVT. When both are minus, the high point is at the PVC and the low point at the PVT. When the plus and minus grades are unequal, the high or low point falls on the side of the curve that has the flatter gradient.
- TM 3-34.55 (3 Aug 2012), paras 3-158 and 3-159
- 12T deep dive: What is a traverse, and what starting data does it need?
- A traverse is a series of straight lines called traverse legs that connect selected points called traverse stations. The surveyor makes distance and angle measurements and uses them to compute the relative positions of the stations on some system of coordinates. Starting data include the coordinates of a starting point and an azimuth to an azimuth mark. If published or higher-headquarters control is available, the starting direction is taken from a trigonometric list or computed from known coordinates.
- TM 3-34.55 (3 Aug 2012), paras 7-1, 7-2, and 7-3
- 12T deep dive: How is starting control obtained when no survey control is available?
- When survey control is not available, the surveyor must assume the coordinates of the starting station, approximating the correct coordinates as closely as possible. If a map is available, the approximate coordinates and starting direction may be scaled from the map; for survey purposes, data scaled from a map are considered assumed data. When neither control nor maps are available, the starting direction is determined by the most accurate means available.
- TM 3-34.55 (3 Aug 2012), paras 7-4 and 7-5
- 12T deep dive: Why is an open traverse the least desirable type?
- Construction surveying uses two basic types of traverse: open and closed. An open traverse originates at a starting station, proceeds to its destination, and ends at a station whose relative position is not previously known. It is the least desirable type because it provides no check on fieldwork or starting data. Planning a traverse always provides for closure, and traverses are closed in all cases where time permits.
- TM 3-34.55 (3 Aug 2012), paras 7-6 and 7-7
- 12T deep dive: What is a loop traverse, and what check does it provide?
- A loop traverse starts at a given point, proceeds to its destination, and returns to the starting point without crossing itself. It is used to provide control of a tract or parcel boundary and data for the area computation within the boundary, or when there is little existing control and only relative position is required. It provides some check upon the fieldwork and computations, but it does not provide a check of starting data or ensure detection of all systematic errors.
- TM 3-34.55 (3 Aug 2012), paras 7-9 and 7-10
- 12T deep dive: Which type of closed traverse is preferred, and why?
- A traverse closed on a second known point begins at a point of known coordinates, moves through the required point or points, and terminates at a second point of known coordinates. The surveyor prefers this type because it provides a check on the fieldwork, computations, and starting data, and a basis for comparison to determine the overall accuracy of the work.
- TM 3-34.55 (3 Aug 2012), para 7-11
- 12T deep dive: What are the rear, occupied, and forward stations, and how are horizontal angles measured?
- The rear station is the station from which the party has just moved, or a point to which the azimuth is known. The occupied station is the station at which the party is located and over which the instrument is set. The forward station is the next station in succession. Always measure horizontal angles at the occupied station by sighting the instrument at the rear station and measuring the clockwise angle to the forward station, pointing to the lowest visible point of the target.
- TM 3-34.55 (3 Aug 2012), paras 7-12 and 7-13
- 12T deep dive: How is traverse distance measured, and why should the number of stations be kept to a minimum?
- Measure the distance in a straight line between the occupied station and the forward station, using horizontal taping procedures or electronic distance-measuring equipment. The surveyor should keep the number of stations to a minimum to reduce the accumulation of instrumental errors and the amount of computing required. Short traverse legs require more stations and may cause excessive errors in azimuth because small errors in centering, marking, and pointing are magnified in the azimuth closure.
- TM 3-34.55 (3 Aug 2012), paras 7-14, 7-15, and 7-16
- 12T deep dive: How are traverse stations marked and referenced?
- Traverse station markers are usually 2- by 2-inch wooden stakes, 6 inches or more in length, called hubs, driven flush with the ground. The center of the top of the hub is marked with a surveyor’s tack or with an X to designate the exact point of reference. To help recover the station, the surveyor drives a reference (witness) stake so that it slopes toward the station and writes the station identification on the stake or on a tag; signal cloth may also be tied to the reference stake.
- TM 3-34.55 (3 Aug 2012), paras 7-17 and 7-18
- 12T deep dive: How must a range pole be used when measuring traverse angles?
- The most commonly used station signal is the range pole. When measuring angles, the surveyor places the tapered point of the range pole on the station mark and uses a rod level to make the pole vertical, checking that the bubble remains centered at other points on the pole. The pole is kept vertical throughout the observation, either with a range-pole tripod or by someone holding it. To prevent measuring angles to the wrong point, the surveyor places the range pole in a vertical position only when it is being used to mark a survey station.
- TM 3-34.55 (3 Aug 2012), paras 7-19 and 7-20
- 12T deep dive: When may the azimuths of a traverse be adjusted?
- The surveyor must determine the need for adjustment before beginning final coordinate computations. If the angular error of closure falls within the computed allowable error, the surveyor may adjust the azimuths of the traverse.
- TM 3-34.55 (3 Aug 2012), para 7-30
- 12T deep dive: What are the objectives of surveying for building construction?
- To lay out the proposed structure according to prepared plans and to mark the controlling points of the structure in the manner that is most useful to the construction forces. This marking consists of indicating the corners of the building and other horizontal and vertical positions by means of stakes, batter boards with string lines, drill holes, cut-and-fill notations, and similar conventional methods.
- TM 3-34.55 (3 Aug 2012), para 6-1
- 12T deep dive: What typical survey steps precede the layout of a major building?
- Performing reconnaissance (aerial, map, and ground); selecting the site (paper and instrument); establishing horizontal and vertical control; and taking topography (plane table or transit stadia). The building and its foundation are then positioned according to the controlling dimensions and references on the prepared plans.
- TM 3-34.55 (3 Aug 2012), paras 6-2 and 6-3
- 12T deep dive: What are batter boards, and why are they used?
- After the surveyor locates the building corners and determines foundation elevation from a benchmark or other point of known elevation, stakes or slats mark the general location for initial excavation and rough grading. Those stakes will be disturbed or destroyed during that work, so more suitable marks—batter boards—are placed. The surveyor uses these temporary devices to mark the outline and grade of the structure and any special construction inside or outside.
- TM 3-34.55 (3 Aug 2012), para 6-5
- 12T deep dive: How are batter boards built and placed?
- Batter boards consist of two 2- by 4-inch stakes driven into the ground and a 1- by 6-inch crosspiece nailed to each stake. The stakes are driven about 3 to 4 feet away from the building line so they will not be disturbed by construction but will be far enough apart to straddle the line to be marked. The surveyor sets all batter boards for one structure to the same grade or level line. A cord stretched over the top edge of two batter boards and held against nails driven at the building-line marks defines the building line and grade elevation.
- TM 3-34.55 (3 Aug 2012), paras 6-6 and 6-7
- 12T deep dive: What surveys are made for a bridge, and what governs the exact site?
- Bridge surveying is necessary to locate a site, obtain information for design, and furnish lines and grades for construction. A reconnaissance survey is made at all possible sites, a preliminary survey is made at the best site to establish horizontal and vertical control and obtain design and planning information, and a location survey is made to lay out the bridge according to the plans. Tactical requirements fix the general area; technical requirements fix the exact location and may eliminate sites that are tactically acceptable. For permanent construction, technical considerations govern the bridge location.
- TM 3-34.55 (3 Aug 2012), paras 5-1 and 5-3
- 12T deep dive: What duties does the construction draftsman have?
- The construction draftsman draws working plans for bridges, airfields, roads, railroads, piers, and buildings; plots profiles for roads, railroads, and other military construction from survey notes or large-scale contour maps; modifies, corrects, or improves drawings to conform to specifications; assists the design and contracting officer in modifying the design of steel, concrete, masonry, or wood structures or their details; and plans and organizes work schedules, assigns duties, and instructs subordinate personnel.
- TM 3-34.51 (15 Jun 2012), para 1-3
- 12T deep dive: Why is engineering drawing called the graphic language of the engineer?
- It has definite rules of usage to make sure that it has the same meaning wherever it is used. Anyone who learns the rules can read engineering drawings. The drawing must present information such as size, shape, location, and material so that the finished product will accord with the designer’s requirements, and special drawing instruments are used to record this language with the required accuracy.
- TM 3-34.51 (15 Jun 2012), para 1-4
- 12T deep dive: What principles of military construction should a draftsman keep in mind?
- Construction should be accomplished within the allocated time using a minimum of materials, equipment, and manpower. If new design is necessary, it should be simple and flexible and must reflect available materials and the level of training of construction personnel. The permanency of any structure erected must not exceed limits established by the theater commander.
- TM 3-34.51 (15 Jun 2012), para 1-7
- 12T deep dive: What does a set of construction working drawings and specifications provide?
- The building of any structure is described by a set of related drawings and specifications that give the workmen a complete graphic description of the total project. A set of working drawings usually begins by showing the boundaries, contours, and outstanding physical characteristics of the site, and succeeding drawings give instructions for excavation, foundations and superstructures, utilities, and whatever else is required to complete the project. Each drawing is related to the others; for example, a foundation plan must work together with the sections, floor plan, and foundation details.
- TM 3-34.51 (15 Jun 2012), paras 2-2 and 2-12
- 12T deep dive: What is the draftsman’s role between the engineer and the construction worker?
- The draftsman must have a speaking knowledge with the engineer and construction worker, and specific knowledge of graphic communication. It is the draftsman’s job to interpret the engineer’s sketches, calculation results, and ideas into usable working drawings for the construction workers.
- TM 3-34.51 (15 Jun 2012), para 2-17
- 12T deep dive: What is a plan in building drawings, and what types are commonly used?
- A plan corresponds to a top view—a projection on a horizontal plane. Types include site plans, foundation plans, and floor plans. General drawings consist of plans and elevations; detail drawings are made up of sectional and detail views.
- TM 3-34.51 (15 Jun 2012), paras 4-2 and 4-3
- 12T deep dive: What does a site plan show, and what does a foundation plan show?
- A site plan shows the building site with boundaries, contours, existing roads, utilities, and other physical details such as trees and buildings. It is drawn from notes and sketches based upon a survey, with the structure layout superimposed on the contour drawings. A foundation plan is a top view of the footings or foundation walls, showing their area and location by distances between centerlines and distances from reference or boundary lines. Foundation walls are located by dimensions to their corners, and all openings in foundation walls are shown.
- TM 3-34.51 (15 Jun 2012), paras 4-4 and 4-5
- 12T deep dive: When are detail drawings used?
- Details are large-scale drawings showing the builders how various parts are to be connected and placed. They are used whenever the information in elevations, plans, and sections is not clear enough for the mechanics on the job, and they are usually grouped so that references may be made more easily from general drawings. The construction at doors, windows, and eaves is customarily shown in detail drawings of buildings.
- TM 3-34.51 (15 Jun 2012), para 4-20
- 12T deep dive: What is a bill of material, and when are nominal versus actual sizes used?
- A bill of material is a tabulated statement of requirements that shows the item number, name, description, quantity, material, stock size, number, and sometimes the weight of each piece. Sizes given in specific notes for structural members are called nominal sizes. For example, a joist whose nominal size is 2 inches thick by 6 inches wide is 1 5/8 by 5 5/8 inches in actual size, because of material lost in finishing or surfacing. Nominal sizes are always used to identify a piece in notes, specifications, and bills of material. On drawings at a scale of 1/2 inch = 1 foot or larger, actual sizes are drawn to scale; at a smaller scale, nominal sizes are used.
- TM 3-34.51 (15 Jun 2012), paras 4-52 and 4-60
- 12T deep dive: What USCS grain-size groups are used, and what are the sieve limits?
- The size groups designated by the USCS (Unified Soil Classification System; the TM body also writes this as “United”) are cobbles, gravels, sands, and fines (silt or clay). In the TM table: boulders have no maximum size and are retained on a 10-inch sieve (in military engineering the maximum size of boulders is accepted as 40 inches, based on the maximum jaw opening of a rock-crushing unit); cobbles pass the 10-inch and are retained on the 3-inch; gravels pass the 3-inch and are retained on the No. 4; sands pass the No. 4 and are retained on the No. 200; and fines (clay or silt) pass the No. 200 and have no minimum size.
- TM 3-34.43 (3 Apr 2015), para 1-8 and table 1-1
- 12T deep dive: What is the difference between well-graded and poorly graded soils?
- Gradation describes the distribution of the different size groups within a soil sample. Well-graded soils have a good range of all representative particle sizes between the largest and the smallest; all sizes are represented, and no one size is overabundant or missing. Poorly graded soils may be uniformly graded (consisting primarily of particles of nearly the same size) or gap-graded (containing large and small particles but missing some sizes).
- TM 3-34.43 (3 Apr 2015), para 1-10
- 12T deep dive: What is specific gravity of a soil material?
- Specific gravity is the ratio between the weight per unit volume of the material and the weight per unit volume of water at a stated temperature. It may be expressed as specific gravity of solids, apparent specific gravity, or bulk specific gravity.
- TM 3-34.43 (3 Apr 2015), para 1-12
- 12T deep dive: How is moisture content defined, and why does it matter?
- Moisture content is often the most important factor affecting the engineering behavior of the soil. It is the proportion of the weight of water to the weight of solid mineral grains (the weight of dry soil), expressed as a percentage.
- TM 3-34.43 (3 Apr 2015), para 1-14 (including the note)
- 12T deep dive: What are the Atterberg consistency states, and what is the plasticity index?
- Atterberg established four states of consistency for fine-grained soils: liquid, plastic, semisolid, and solid. The dividing lines are the liquid limit (LL), the plastic limit (PL), and the shrinkage limit. The LL is the moisture content at an arbitrary limit between the liquid and plastic states; above it a soil is presumed to be a liquid and flows freely under its own weight. The PL is the moisture content at an arbitrary limit between the plastic and semisolid states. The plasticity index (PI) is the numerical difference in moisture content between the LL and PL and defines the plastic range. Soil is considered cohesive if its PI is greater than 5.
- TM 3-34.43 (3 Apr 2015), paras 1-16 and 1-17
- 12T deep dive: How does the USCS divide soils into major divisions?
- Coarse-grained soils have 50 percent or less material passing the No. 200 sieve. Fine-grained soils have more than 50 percent passing the No. 200 sieve. Highly organic soils can generally be identified by visual examination. The USCS recognizes 25 soil groups and uses letter symbols such as G (gravel), S (sand), M (silt), C (clay), O (organic silts and clays), Pt (peat), W (well-graded), P (poorly graded), L (low LL, less than 50), and H (high LL, 50 or greater).
- TM 3-34.43 (3 Apr 2015), paras 1-23 and 1-24 and table 1-2
- 12T deep dive: When is a coarse-grained soil classified as a gravel, and when as a sand?
- A coarse-grained soil is classified as a gravel if more than half the coarse fraction, by weight, is larger than a No. 4 sieve. It is a sand if more than half the coarse fraction, by weight, is smaller than a No. 4 sieve. Where a mixture occurs, the primary name is the predominant fraction and the minor fraction is used as an adjective—for example, a sandy gravel contains more gravel than sand, by weight.
- TM 3-34.43 (3 Apr 2015), para 1-26
- 12T deep dive: How are fine-grained soils classified in the USCS?
- Fine-grained soils are not classified on the basis of grain-size distribution, but according to plasticity and consistency. The two major groupings are the L groups, whose LL is less than 50, and the H groups, whose LL is greater than or equal to 50. Fine-grained soils are further divided by their position above or below the A line of the plasticity chart. Typical soils of the ML and MH groups are inorganic silts: those with an LL less than 50 are ML; others are MH, and all of these soils plot below the A line.
- TM 3-34.43 (3 Apr 2015), paras 1-28 and 1-29
- 12T deep dive: How can highly organic soils such as peat be identified, and why do they matter?
- A special classification is reserved for highly organic soils such as peat, which have many characteristics undesirable for use as foundation and construction materials. These soils can be readily identified in the field by their distinctive color, odor, spongy feel, and fibrous textures. Leaves, grass, branches, or other fibrous vegetable-matter particles are common components.
- TM 3-34.43 (3 Apr 2015), para 1-30
- 12T deep dive: What is a soil survey, and how do hasty and deliberate surveys differ?
- A soil survey consists of gathering soil samples for examining, testing, and classifying soils and developing a soil profile. A hasty survey is made under expedient conditions or when time is very limited and usually accompanies a preliminary site analysis. A deliberate survey is made when adequate equipment and time are available. When possible, a hasty survey should be followed by a deliberate survey.
- TM 3-34.43 (3 Apr 2015), paras 2-1 and 2-2
- 12T deep dive: What is quartering, and how is a sample of more than 100 pounds reduced?
- Quartering is the process of reducing a representative sample to a convenient size or dividing it into two or more smaller samples for testing. For samples weighing more than 100 pounds, mix and pile the sample on a quartering canvas, flatten it to a circular layer of uniform thickness, divide it into four parts with a stick or pipe under the canvas, discard the two diagonally opposite quarters, remix the remaining material, and repeat as necessary to reach the desired size.
- TM 3-34.43 (3 Apr 2015), paras 2-54 and 2-55
- 12T deep dive: What does a specific-gravity test provide for later soil tests?
- Perform the specific-gravity test to determine the specific gravity of solids, which will be used to assist in the hydrometer-analysis test and to calculate the zero-air-voids curve for compaction results. Take particular care to obtain representative samples. It is easier to begin with an oven-dried sample, but some soils, particularly those with a high organic content, are difficult to rewet and should be tested at their natural water content, with the oven-dried weight determined at the end of the test.
- TM 3-34.43 (3 Apr 2015), para 4-1
- 12T deep dive: What does a sieve-analysis test determine, and when is a hydrometer analysis also needed?
- Perform the sieve-analysis test to determine the grain-size distribution, or gradation, of the portion of a soil or aggregate that is larger than the No. 200 sieve. Accurately completed, it produces the percent of gravel, sand, and fines; washing the material over the sieves gives a more accurate percent of fines. Sieve analysis alone may yield enough information to classify a soil and therefore not require hydrometer analysis, but the hydrometer analysis ensures a more accurate depiction of the soil gradation and provides information required to determine frost susceptibility.
- TM 3-34.43 (3 Apr 2015), paras 5-1 and 5-2
- 12T deep dive: How is the liquid limit determined in the standard cup test?
- The LL is the water content, expressed as a percentage of the weight of the oven-dried soil at the boundary between the liquid and plastic states, and is reported as a whole number. The test is performed on two halves of a prepared soil specimen in an LL device. The LL is determined when the soil halves flow together along a distance of 13 millimeters when the cup is dropped or jarred exactly 25 times from a height of 1 centimeter, at a rate of 1.9 to 2.1 drops per second.
- TM 3-34.43 (3 Apr 2015), para 6-1
- 12T deep dive: How is the plastic limit determined?
- From a sample that can be rolled without sticking to the hands, select a marble-size portion of about 2 grams, form it into an ellipsoidal mass, and roll it on a finely ground glass plate with the fingers or palm to a uniform thread diameter of 3.2 millimeters (1/8 inch), taking no more than 2 minutes. The rate of rolling should be between 80 and 90 strokes per minute, counting a stroke as one complete motion of the hand forward and back to the starting position.
- TM 3-34.43 (3 Apr 2015), para 6-16, steps 2–3 (including the note)
- 12T deep dive: What is compactive effort, and which laboratory compaction method does TM 3-34.43 discuss?
- In the laboratory, soil is placed in a cylinder of known volume and a tamper of known weight is dropped from a known height for a given number of blows. The amount of work done to the soil per unit volume in this dynamic compaction is called compactive effort. Each compactive effort for a given soil has its own optimum moisture content (OMC); as the compactive effort is increased, the maximum density usually increases and the OMC decreases. To simplify the procedure, only the high-energy effort known as modified Proctor is discussed; it is suitable for airfield and highway horizontal construction and for embankment and foundation preparation, and ASTM D1557 defines the criteria.
- TM 3-34.43 (3 Apr 2015), paras 7-1 and 7-2
- 12T deep dive: What does the California Bearing Ratio measure, and how is the CBR value defined?
- The CBR test essentially measures the shearing resistance of the soil under controlled moisture and density conditions. The CBR for soil is the ratio obtained by dividing the penetration stress required to cause a 3-inch-square-area piston to penetrate 0.10 inch into the soil by a standard penetration stress of 1,000 pounds per square inch. That standard stress is roughly what is required to cause the same piston to penetrate 0.10 inch into a mass of crushed rock (limestone). The CBR value may be thought of as the strength of the soil relative to that of crushed rock.
- TM 3-34.43 (3 Apr 2015), para 9-1
- 12T deep dive: What range can CBR values have, and how is CBR used in design?
- CBR values range from 0 to more than 100, depending on the type of soil and the moisture content. A misconception is that CBR cannot exceed 100, but some field soils in the right environment can have values exceeding 100. For the purposes of design and evaluation, the CBR will be capped at 100 even if field values exceed this. Minor variations in the test will cause wide variations in the results, and material with gravel or stones does not yield entirely satisfactory results, so a number of tests must be conducted to establish a reasonable average value.
- TM 3-34.43 (3 Apr 2015), paras 9-2 and 9-3
- 12T deep dive: What tests should a complete soils-testing program for road or airfield construction include?
- The tests required depend on the type of construction being planned, but a complete testing program should include soils exploration, compaction, plasticity index, particle-size analysis, CBR, and trafficability.
- TM 3-34.43 (3 Apr 2015), para 10-1
- 12T deep dive: What is the shrinkage limit?
- The shrinkage limit is the boundary moisture content between the semisolid and solid states. This boundary is determined when a soil sample, upon being dried, finally reaches a limiting or minimum volume. Beyond this point, further drying will not reduce the volume, but may cause cracking.
- TM 3-34.43 (3 Apr 2015), para 1-17
- 12T deep dive: What items and data go into a soils technical report?
- Use soil boring logs; the soil profile; field identification of soil; in-place moisture data; particle/grain-size analysis data; LL and PL data; the USCS laboratory soils classification; CBR test data; in-place density data (as required locally); in-place CBR data; a topographic map of the site; aerial photographs if available; and the project directive.
- TM 3-34.43 (3 Apr 2015), para 10-9
- 12T deep dive: Why are construction dimensions often given center-to-center?
- Construction procedure does not involve fine measurements, and tolerancing is not a consideration. Often, as with lumber, the materials are not accurate enough to obtain satisfactory placement by giving dimensions to the edge of the structural member. This difficulty is overcome by giving center-to-center dimensions. Dimensions are given to the centerlines of door and window openings, frame partitions, beams, and columns. Dimension lines in construction drawings are unbroken from one extension line to another.
- TM 3-34.51 (15 Jun 2012), paras 4-40 and 4-41
- 12T deep dive: Why should a draftsman be familiar with specifications even if the draftsman does not write them?
- Although it is not a draftsman’s responsibility to prepare specifications, the draftsman should be familiar with them for two reasons: specifications give detailed instructions regarding materials and methods of work and constitute an important source of pertinent information for the set of drawings; and a draftsman experienced in preparing construction drawings can be of assistance to the specifications writer. Specifications should be written with clear, concise statements, avoiding vague wording such as “the material specified or its equivalent” by stating first and second choices for substitute materials.
- TM 3-34.51 (15 Jun 2012), para 4-49
- 12T deep dive: How do construction-drawing standards differ between a battle area and a rear support area?
- The standards of construction refer to the amount of engineering effort possible at the time of construction. Combat engineers constructing a heliport in a battle area probably will not employ drawings and will reduce the quality of the landing pad in order to expedite use of the facility. In rear support areas, much more in-depth planning and more exact construction will take place, requiring sketches, preliminary designs, revised designs, and a complete set of working drawings. It is the draftsman’s responsibility to realize the standards of construction intended so that the drawings will supply the proper depth of information.
- TM 3-34.51 (15 Jun 2012), para 2-9
- 12T deep dive: How does a surveyor stake a long-radius simple curve when the center cannot be occupied?
- On curves with long radii, it is impractical to stake the curve by locating the center of the circle and swinging the arc with a tape. The surveyor lays these curves out by staking the ends of a series of chords; the ends of the chords lie on the circumference of the curve and thus define the arc in the field. The chord length varies with the degree of curve: 100 feet (30 meters) for D from 1 to 3, 50 feet (15 meters) for D from 3 to 8, 25 feet (7.5 meters) for D from 8 to 16, and 10 feet (3 meters) for D over 16.
- TM 3-34.55 (3 Aug 2012), para 3-32
- 12T deep dive: How may vertical-curve length be adjusted, and to what kind of design do the TM’s L formulas apply?
- If L does not come out to a whole number of stations, it is usually extended to the nearest whole number. That reduces the rate of change. Thus, L = 4.8 stations would be extended to 5 stations, and the value of r computed from r = ΔG/L. These formulas are for road design only; the surveyor must use different formulas for railroad and airfield design.
- TM 3-34.55 (3 Aug 2012), para 3-142
- 12T deep dive: How can the building line be transferred to batter boards if an instrument is not available?
- If the corner stakes have not been disturbed, the surveyor can transfer the building line to the batter boards by stretching a cord over the batter boards and using plumb bobs held over the corner stakes. The surveyor moves the cord on each batter board until it just touches both plumb-bob strings, marks the position of the cords, and drives in the nails.
- TM 3-34.55 (3 Aug 2012), para 6-8
- 12T deep dive: How does the surveyor determine the length of a bridge crossing?
- The surveyor determines the length of the bridge crossing to estimate the materials required for construction. Depending on the distance and equipment available, the surveyor measures this distance with a tape, an electronic measuring device, or by the stadia method.
- TM 3-34.55 (3 Aug 2012), para 5-5
12T – Thin Section: Units, Terms & Organization (Curve and Traverse Terms)
Source: TM 3-34.55 (Construction Surveying, 3 Aug 2012). Complements mos-12t-technical-engineer and mos-12t-3; does not remake the arc/chord degree-of-curve, PI/PC/PT, PVC/PVT/PVI, open/loop/closed-traverse, or CBR cards. Verify current editions.
- 12T deep dive: How are a sag (invert) curve and a summit (overt) curve defined?
- When two grade lines intersect, the intersection is rounded off with a parabolic curve so the change of direction is gradual. A sag or invert curve connects a descending grade with an ascending grade, or with one descending less sharply. A summit or overt curve joins an ascending grade with a descending grade, or with one ascending less sharply.
- TM 3-34.55 (3 Aug 2012), paras 3-136 and 3-137
- 12T deep dive: How are the rear, occupied, and forward stations defined in a traverse?
- In a traverse, three stations are of immediate significance: the rear station, the occupied station, and the forward station. The rear station is the station from which the party has just moved, or a point to which the azimuth is known. The occupied station is the station at which the party is located and over which the instrument is set. The forward station is the immediate destination, or the next station in succession.
- TM 3-34.55 (3 Aug 2012), para 7-12
- 12T deep dive: Under the chord definition of degree of curve, are the radius and the degree of curve inversely proportional, and where is that definition used?
- Under the chord definition, the radius and the degree of curve are not inversely proportional, even though a larger degree of curve is still a sharper curve with a shorter radius, as in the arc definition. The chord definition is used primarily on railroads in civilian practice and, in military work, for both highways and railroads.
- TM 3-34.55 (3 Aug 2012), para 3-28
12T – Section floor: Units, Terms & Organization (Survey and Design Teams and Specialized Engineer Units)
Source: ATP 3-34.40/MCTP 3-40D (MCWP 3-17.7), General Engineering, 14 Apr 2023. Complements mos-12t-technical-engineer, mos-12t-3, and mos-12t-4. Does not remake the 12T4O Survey and Design Detachment duty card or the curve-and-traverse definition cards. Public, unclassified sources only. Verify current editions.
- 12T deep dive: What types of units and what detachment or platoon organizations support general engineers, including the survey and design team?
- Specialized engineer units that support general engineers in construction efforts include engineer facilities detachments, engineer utilities detachments, survey and design teams, firefighting teams, construction management teams, forward engineer support teams (FEST), diving teams, asphalt teams, concrete teams, well-drilling teams, geospatial engineering teams, quarry teams, and prime power teams.
- ATP 3-34.40/MCTP 3-40D (14 Apr 2023), para 1-7
- 12T deep dive: How are specialized engineer types of units organized in support or reinforcing roles, and which platoon or team organizations assist with planning updates?
- Construction management teams, geospatial engineering teams, equipment support platoons, and survey and design teams assist in construction planning and maintain updates to the common operational picture for construction updates. If required, the Geospatial Planning Cell can assist in infrastructure efforts for humanitarian assistance, domestic response, and defense support of civil authorities. Specialized engineer unit capabilities are applied in general support or general support reinforcing roles to enhance general engineering efforts.
- ATP 3-34.40/MCTP 3-40D (14 Apr 2023), para 1-8
12T – Toward 20: Board-supplement key development
Source: CMF 12 NCO Evaluation Board Supplement, 25 Aug 2025 (Army G-1 public board brief). Complements mos-12t-technical-engineer and mos-12t-3 through mos-12t-5. Does not remake DA Pam 611-21 qualification cards. Fitness-score lines from the supplement are omitted. Public, unclassified sources only. Verify current editions.
- 12T deep dive: For a 12T career path, what key-development time and jobs does the CMF 12 board supplement list as most qualified for an SSG and SFC?
- Most qualified for an SSG is 30-36 months as a successful Technical Engineer NCO, Technical Topographic Survey NCO, or Drill Sergeant, followed by a successful broadening assignment. Most qualified for an SFC is 30-36 months as a successful Senior Topographic Survey NCO, Senior Technical Engineer NCO, or Senior Drill Sergeant, followed by a successful broadening assignment.
- CMF 12 NCO Evaluation Board Supplement (25 Aug 2025), MOS 12T SSG/SFC, Key Development Positions
- 12T deep dive: For a 12T career path, what highly qualified key-development time does the board supplement list for an SSG and SFC?
- Highly qualified for an SSG is 24 months as a successful Technical Engineer NCO or Technical Topographic Survey NCO, followed by a successful broadening assignment. Highly qualified for an SFC is 24 months as a successful Senior Topographic Survey NCO or Senior Technical Engineer NCO, followed by a successful broadening assignment.
- CMF 12 NCO Evaluation Board Supplement (25 Aug 2025), MOS 12T SSG/SFC, Key Development Positions
12T Technical Engineer: Qualifying standards
Source: DA Pam 611-21 ch. 10C (Oct 2026 copy). The existing 12T physical-demands card states Moderate (Gold) and normal color vision but does not put the profile code in the answer; this card states that code only. Public, unclassified sources only. Verify current editions.
- 12T: What physical profile code does DA Pam 611-21 list for 12T?
- A physical profile code of 221211.
- DA Pam 611-21 ch. 10C (Oct 2026 copy), 10-12T para b(2)
12T Technical Engineer: School graduation standards
Source: MSCoE NCOA Engineer Advanced Leader Course information letter, 6 June 2025; MSCoE NCOA Engineer Senior Leader Course welcome letter, 8 April 2026. Complements the existing 12T AIT-location and formal-training cards; does not remake AIT length. Public, unclassified sources only. Verify current editions.
- 12T: How is Engineer Advanced Leader Course organized, according to the June 2025 information letter?
- As of the 6 June 2025 letter (check current program): it is two phases. Phase 1 is virtual on Microsoft Teams with a Small Group Leader. Phase 2 is in person at the MSCoE Noncommissioned Officer Academy, Fort Leonard Wood, MO. Failing to join the virtual classroom on Day 1, or failing to arrive at Fort Leonard Wood on the Phase 2 report date, is a NO SHOW.
- MSCoE NCOA, Engineer Advanced Leader Course information letter (12B, 12C, 12H, 12N, 12T, 12Y, and 91L), 6 June 2025, paras 2–3, https://home.army.mil/wood/3617/5068/8927/NCOA_EN_ALC_Welcome_Letter_06JUN25.pdf
- 12T: What height-and-weight and fitness rules did the June 2025 Engineer ALC letter set for graduation?
- As of that letter (check current program): a height-and-weight screening is a mandatory graduation requirement. Students also take a record Army Fitness Test (AFT) during the course; if they fail, they get a retest, and no administrative action is taken under MILPER 25-228.
- MSCoE NCOA, Engineer Advanced Leader Course information letter, 6 June 2025, para 6, https://home.army.mil/wood/3617/5068/8927/NCOA_EN_ALC_Welcome_Letter_06JUN25.pdf
- 12T: How is Engineer Senior Leader Course organized for 12T, according to the April 2026 welcome letter?
- As of the 8 April 2026 letter (check current program): 12T SLC has a multi-phase program of instruction. Phase 1 is virtual via Microsoft Teams, and Phase 2 is in person at Fort Leonard Wood, MO. Phase 1 virtual learning feeds the active-component Phase 2, and Phase 1 distance learning feeds the reserve-component Phase 2; the phases cannot be mixed.
- MSCoE NCOA, Engineer Senior Leader Course welcome letter, 8 April 2026, para 2, https://home.army.mil/wood/3717/7567/4397/New_EN_SLC_Welcome_Letter_8-APR-2026_v3.pdf
12T Technical Engineer: Final exam study guide
Source: DA Pam 611-21 ch. 10C (Oct 2026 copy), 10-12T para a and a(1)–(3). Complements existing 12T major-duties and SL1 list cards; does not repeat them word for word. No public STP or ICTL for 12T was on disk for this pass. No exam questions or passing scores are invented here. Public, unclassified sources only. Verify current editions.
- 12T (review): Besides the surveying, drafting, materials-testing, and quality-control tasks already listed at skill level 1, what GPS work does DA Pam 611-21 add at SL1, and how does that GPS work change at SL2?
- At SL1 the technical engineer also processes and adjusts Global Positioning System (GPS) survey data. At SL2 the Soldier still supervises the surveying, drafting, testing, and quality-control tasks, and corrects and validates GPS survey data.
- DA Pam 611-21 ch. 10C (Oct 2026 copy), 10-12T para a(1)–(2) (MOSC 12T1O and 12T2O). Review of the GPS step that the existing SL1 duty-list card does not include; the separate GPS-instrument card remains.
- 12T (review): How do 12T duties change from skill level 1 to skill level 3 in DA Pam 611-21?
- SL1 performs construction surveying, geodetic surveying, computer-aided drafting, testing of construction materials, and quality-control inspections, and processes and adjusts GPS survey data. SL2 supervises those same tasks and corrects and validates the GPS data. SL3 directs and inspects those tasks and GPS data, reconnoiters and plans construction surveys to determine special requirements, determines soils-stabilization methods for military construction, designs concrete and asphalt mixtures, prepares project progress reports, and conducts project briefings.
- DA Pam 611-21 ch. 10C (Oct 2026 copy), 10-12T para a(1)–(3) (MOSC 12T1O, 12T2O, and 12T3O). Review summary only.
12T – Technical Engineer
Source: DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12T); DA Pam 611-21 ch. 10 MOS/skill-level classification listing (chapter-10-base); TM 3-34.55 (3 Aug 2012); TM 3-34.43 (3 Apr 2015); TM 3-34.44 (23 Jul 2012 incl C1). Verify current editions.
- 12T: What is the primary role of the Technical Engineer?
- Status: current MOS (DA Pam 611-21 ch. 10C). To perform construction surveying, drafting/design, and soil and material testing to support engineer construction projects.
- DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12T) para a
- 12T: Where is 12T AIT?
- Fort Leonard Wood, MO – verify current length on goarmy.com.
- DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12T) para b(6) (course under the USA Engineer School); 10C gives the USAES address as Ft Leonard Wood, MO (DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12D) para a; DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12P) para b(9)). Course length not in 10C
- 12T: What are the three main areas of 12T work?
- Surveying, drafting (CAD design), and materials quality testing (soils, concrete, asphalt).
- DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12T) paras a and a(1) (construction and geodetic surveying, computer aided drafting, testing on construction materials, quality control inspections) and a(3) (designs concrete and asphalt mixtures)
- 12T: What survey instrument is commonly used?
- GPS survey equipment (12T1Os process and adjust GPS survey data), levels for running elevations from benchmarks, and electronic distance-measuring equipment. Total stations are widely used, but the pubs checked do not name them.
- DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12T) para a(1) (processes and adjusts GPS survey data); TM 3-34.55 (3 Aug 2012) paras 2-13 (level party establishes benchmarks) and 7-14 (electronic distance measuring). "Total station" was not found in TM 3-34.55, TM 3-34.43 or ATP 3-34.80
- 12T: What is a benchmark?
- A permanent reference point of known elevation used for surveying.
- TM 3-34.55 (3 Aug 2012) paras 2-13 (level party establishes benchmarks, set well out of the construction area), 2-50 and 6-5 ("a benchmark, or other point of known elevation")
- 12T: What is a slump test?
- A test of fresh concrete consistency (workability).
- TM 3-34.44 (23 Jul 2012 incl C1) paras 1-16 (consistency "is measured by the slump test") and 3-10, and app. B (method of making slump test)
- 12T: What is a soil compaction test used for?
- To verify that soil has reached required density (e.g., nuclear density gauge or sand cone test).
- TM 3-34.43 (3 Apr 2015) ch. 8 (in-place density determination): paras 8-1 and 8-2 (sand cone method) and 8-20 (nuclear moisture and density tester gives dry density and moisture content)
- 12T: What safety concern applies to a nuclear density gauge?
- It contains radioactive sources; follow radiation safety, licensing, storage, and transportation rules.
- TM 3-34.43 (3 Apr 2015) paras 8-20 (follow the manufacturer's manual, Service radiation protection program and the Nuclear Regulatory Commission licensing agreement) and 8-21 (radioactive sources: cesium and americium/beryllium)
- 12T: What software is used for design work?
- Computer-aided drafting (CAD) software; 10C lists computer aided drafting among 12T duties at skill levels 1–3. The specific programs are not named in the pubs checked.
- DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12T) paras a(1)-(3). Named CAD products were not found in 10C, TM 3-34.51 or TM 3-34.55 and were removed
- 12T: How does DA Pam 611-21 summarize the 12T major duties?
- The technical engineer supervises or participates in construction and airfield site development, establishing permanent survey control stations, producing construction plans, performing quality control inspections, and performing field and laboratory testing on construction materials. (ch. 10C)
- DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12T) para a
- 12T: What minimum ASVAB line score does DA Pam 611-21 list for 12T?
- 101 in ST (Skilled Technical) (ch. 10C; verify current standards).
- DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12T) para b(4)(a) (ST 101; checked against 10C)
- 12T: What physical demands rating applies to 12T?
- Moderate (Gold); normal color vision required (ch. 10C).
- DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12T) paras b(1)-(3) (10C also lists profile 221211 at b(2))
- 12T: Under whose auspices is the 12T MOS course conducted?
- The USA Engineer School (DA Pam 611-21 ch. 10C).
- DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12T) para b(6)
- 12T: What are examples of additional skill identifiers (ASIs) for 12T?
- B9 – Bradley Fighting Vehicle (BFV); P6 – Project Management; Q6 – Protection Cell Operations; R7 – Army Reconnaissance (DA Pam 611-21 ch. 10C).
- DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12T) para c(1)-(4)
- 12T: What does DA Pam 611-21 list as 12T duties at skill level 1?
- Performs construction surveying, geodetic surveying, computer aided drafting, testing on construction materials, and quality control inspections. (ch. 10C)
- DA Pam 611-21 ch. 10C (Oct 2026 copy) (10-12T) para a(1) (MOSC 12T1O)